Planning your renovation: from keys to handover

A step-by-step plan for renovating a Sabah home, from before you get your keys to handover: what to prepare, management approvals in general terms, and questions to ask any contractor.

7 min readBy the Cabchen team

Short answer

Plan in stages: set your priorities and budget range, collect your floor plan and photos, talk to a designer early, then book a site visit and measurement. Review the 2D layout, 3D visuals and quotation, secure any management approval, and only then start production and installation. Finish with a walkthrough at handover and keep your warranty and product details.

A designer measuring a room with a laser measure and tape, with plans on a clipboard
A designer measuring a room with a laser measure and tape, with plans on a clipboard.

Before you get your keys

The weeks before vacant possession are a good time to plan. You can shortlist ideas, set priorities and talk to a designer using your floor plan, so you are ready to move quickly once you have access.

Some decisions need the real space, such as exact measurements, wall conditions and plumbing points. A good designer will tell you what can be prepared now and what must wait for the site visit.

What to prepare

Collecting these early makes every conversation more productive.

  • Your floor plan, with any dimensions you have
  • Photos of the current space, including walls, ceilings and existing points
  • A list of must-haves and nice-to-haves for each room
  • Appliances you already own and want to keep, with sizes
  • Pictures of styles you like, and ones you do not
  • A rough budget range you are comfortable with
  • Your target move-in date, and any fixed dates such as a family event

Step 1: Tell the designer about your space

Share the rooms you want to work on, the property type, your stage and timing, your budget range and the look you like. Cabchen's Plan my renovation form asks exactly these questions in about two minutes, and the team replies on WhatsApp.

Step 2: Site visit and measurement

An accurate measurement is the foundation of made-to-measure cabinetry. During the visit the designer also checks practical details: plumbing and electrical points, wall and floor conditions, ceiling heights, access for delivery and any building rules.

This is the right moment to ask questions and walk through how you use each room.

Step 3: 2D layout, 3D visuals and quotation

You should see a 2D layout and a 3D view of the finished space before anything is made. Use this stage to adjust layouts, materials and details on paper, where changes are easy.

Review the quotation line by line. Check that materials, hardware, worktops, appliances, installation and any electrical or plumbing work are clearly listed, and that warranty terms are confirmed in writing.

Condo management approvals, in general terms

Most condominiums and many gated developments have renovation rules. These commonly cover permitted working hours, a renovation deposit, contractor registration or passes, lift and loading bay bookings, protection of common areas, and debris disposal.

Rules differ between buildings, so read your management's guidelines and apply early. Ask your contractor what documents they usually provide for approval. Landed homes may have their own requirements for structural or external changes, so check before planning major works.

Step 4: Production and installation

Once the design and materials are confirmed, cabinetry is made to your measurements. Timing depends on scope, materials and site readiness, so ask for a schedule with your confirmed quotation rather than relying on a general estimate.

Installation usually follows other trades such as electrical, plumbing, ceiling and flooring work. Good coordination between these trades avoids delays and damage. Cabchen coordinates renovation and installation with one team, so you are not chasing separate contractors.

Step 5: Handover and after-sales

Walk through the finished space with your contractor. Open every door and drawer, check alignment and soft-close action, run the taps and check for leaks, and test appliances and lights.

  • Note any items to adjust and agree when they will be fixed.
  • Keep appliance manuals, model numbers and warranty documents together.
  • Ask how to care for your worktops and cabinet finishes.
  • Save your contractor's after-sales contact.

Questions to ask any contractor

Whoever you choose, clear answers to these questions protect you.

  • Will you visit and measure before giving a final quotation?
  • Will I see a 2D layout and 3D visuals before production?
  • Which materials, boards and hardware are included, by name?
  • Who handles electrical, plumbing and other trades?
  • What is the schedule, and what could delay it?
  • What payment stages apply?
  • What warranty applies, and will it be in writing?
  • Who do I contact after handover?

Common questions

Quick answers

Can I start planning before I get my keys?
Yes. Share your floor plan and timing and a designer can help you prepare ideas and priorities. Exact measurements are taken once you have access to the unit.
How long does a renovation take?
It depends on the scope, materials and site readiness. Cabchen gives you a schedule with your quotation once the design and materials are confirmed.
Do I need approval from my condo management?
Most condominiums have renovation rules and an approval process. Check your building's guidelines early and ask your contractor what documents they can provide.